BOURS / OF-SHORE / ON-SHORE - OTHER WORKS
In order to satisfy the clients demand, our professional knowledge has allowed the incorporation of suitable means and the high grade of specialization of our staff, our company has incorporated an ample doe of services, executing and participating in a huge variety of maritime, port, and ground works like water takes of refrigeration of plants and industrial plants, plants to make water drinkable, submarines gas ways, ports and docks.
 
Dismount of old system of wood gates in Puerto Madero. Dock1/Darsena Sud, extracting of 6 gates of 100 tons of weight each one built in 1889.
 
Assembly of the turn system and two fixed plates of the Puente de la Mujer (Calatrava Architect) with use of G/F "HERCULES" in Dock3 of Puerto Madero.
 
Demolition and underground adaptation of Refrigeration sea inlet 1 and 3 of Central Termica Dock Sud.
 
Off-Shore diving services in connection with the installation of pipeline for the Gasoducto Cruz del Sur between Argentina and the Rep. Oriental del Uruguay, in Rio de La Plata crossing.
  Providing of Pontoons and tug for the transporting of pipeline for the Gasoducto Cruz del Sur between Argentina and the Rep. Oriental del Uruguay, in Rio de La Plata crossing.
 
Assembly grids inlet sea, recovering and repairs anchoring lines and recovering of lost charge, are some of the done works developers.

  Cleaning and Inspection of the aspiration pipe of water of 40 mts. of longitude to a depth of 24 mts. of the Plant Celulosa Alto Paraná, in Misiones Rep. Argentina. For Alto Parana S.A.

  Cleaning, repairs and change grids of the inlet refrigeration water Hydroelectric Futaleufu Dam, with 48 mts.depth . In the Lake Futalaufquen of the Pcia. of Chubut. For Aluar CORP.

  Underwater Survey sinking B/P "CONARPESA V", casualty in proximities of Camarones Bay in a depth of 29 mts. To carried out the inspection with evaluation of damages, video filming and photographs.
  Reparation and reinstalation of Barge Defensa de la Pila 250 of Bridge Gral. Justo Jose de Urquiza of Complex Zarate/Brazo Largo. River Parana Guazu.
 

Underwater repair of gas pipeline Cruz del Sur, detection and measurement of damage place, transportation of equipment and preparing for montage of habitat welding (welding realized by divers of Global Company), complete protection and consolidation of a pipe, repairing of progressive 12.4 of crossing Rio de la Plata.

  Whole repairing and reinstallation of Tower Pump W-35 in Rio de la Plata, property of Distillers Shell C.A.P.S.A.


  Reinstallation of fixed arms system of Corbeta "ARA URUGUAY" in Dock 4 of Puerto Madero.

  Integral survey and mensuration of current speed of water of the pipeline Mesopotámico in crossing Parana River, Aldea Brasilera (under water crossing) for Transportadora de Gas del Norte

 

Integral submarine survey and potentials mensuration of the anchorages system of the gas-pipeline San Martin in Costa Norte Estrecho de Magallanes (submarine crossing) for Transportadora de Gas del Sur.

  Installation of metallic filters plates for sealing of piles in the New Port San Nicolás berth. For account of Pilotes TREVI S.A.

  Removal with uderwater blastings and extraction of the basements of the old bridge for the crossing the Arroyo Potrero Stream in the .Prov. Nº 1. Customer: Marcalba S.A

 

Transport and mounting of two fire towers of 18 mts. of height and 5 tons weight each one, in the propane Dock Sud Customer: CA Group. S.A

 

Nailed with flogging hammer of metallic piles-cover for the construction of a new two dolphins of mooring of the Casino Puerto Madero, Dársena Sud Puerto de Buenos Aires. Client: DIPRONOR S.A.

 

Rescue with Floating Crane of an overturned caterpillar mounted crane on the Pontoon "29", over the deck with fall risk in to the Dock South access Channel, weight of the rescued crane, 70 tons. Client: DYOPSA S.A.

 

Removal and extraction of remains of the former La Salada Bridge, General Belgrano Railroad, 24 wooden piles and their concrete basis were extracted buried up to 6 mts. in the channel, also the profiles were extracted who conformed the bridge plate, liberating the water laying. Client: Comite Ejecutor de la Cuenca Matanza-Riachuelo

 

Dredged and post-trenching of pipeline tract San Martin II in the crossing of the River Chubut, Dolavon, Chubut Province. One carries out a dredged by suction, with the Modular Dredge "MARTIRIO" and attendance with divers of interferences liberation, achieving the burial under the layer of a ø 24"pipeline. Client: SKANSKA S.A.